Case Study / Project: 8MW Air-cooled Capacity Testing in Southeast Asia
게시자 Vera Su ~에
| Project Information | A leading cloud computing client in Southeast Asia |
| Customer Industry | Data Center |
| Application | Electrical Testing |
| Product | EA3151A-200kW |
| Power | 200kW |
| Voltage | 415VAC |
| Testing Target | Verify the performance of generators, busbar systems, HVAC, etc. |
| Project Requirements | The width of an individual test chamber must not exceed 1 meter. It must be capable of instantaneous loading. |
| EMAX Solution | Redesign the fan orientation and the control room location. |
| Testing/Commissioning Result | The test was successfully completed. |
This project partners with a leading Southeast Asian cloud computing operator in the data center sector, focusing on electrical performance validation. The client selected the EMAX EA3151A-200kW load bank rated at 200kW and 415VAC to conduct comprehensive electrical testing for generators, busbar assemblies and HVAC systems within the facility.
Two strict technical constraints defined the project scope. First, the width of each individual test chamber could not exceed 1 meter. Second, the equipment had to support instantaneous loading capability to simulate real-world sudden power demand changes, a critical requirement for data center power resilience verification.
To meet these challenging specifications, EMAX delivered a customized solution by redesigning fan orientation and relocating the control room layout, fully adapting the unit to the confined space while preserving instantaneous loading function. After on-site installation, testing and commissioning, all functional and performance checks passed successfully. The validated load bank provides reliable electrical testing capacity, helping the cloud client confirm stable operation of core power infrastructure and guarantee data center power supply reliability.